du NOC requirements


For OSP/civil Infrastructure NOC

  • The submittal must be in the form of Two (2) hard copies and one soft copy (Auto-CAD format) along with a fully completed NOC application form.
  • Submitted drawing projection must be clearly mentioned in the drawing plans.
  • Any changes to the approved drawings will invalidate the NOC and will require another application to amend the NOC.
  • Any resubmissions should include both the updated documents and the last submitted items including a copy of rejected drawings if needed. Incomplete attachments will not be accepted.
  • Telecom ducting infrastructure needs to hand over to EITC at least Eight (8) weeks before telecommunication service is required.
Checklist for Infrastructure NOC:
  • Key plan and detailed master plan drawings of development showing land use and plot numbers.
  • Road cross section details.
  • Project Population Plan/utility calculation.

 


For Building NOC

  • It is the responsibility of the building consultant/contractor to liaise with the project ducting infrastructure consultant(s) to coordinate the entry points into the building.
  • The submittal must be in the form of 2 CDs (1 blank + 1 soft copie of Auto-CAD and PDF formats) along with a fully completed NOC application form.
  • Any changes to the approved drawings will invalidate the NOC and will require another application to amend the NOC.
  • Any resubmissions should include both the updated documents and the last submitted items including a copy of rejected drawings if needed. Incomplete attachments will not be accepted.
  • EITC Telecom Equipment Rooms should be ready, as per EITC standards and specifications, at least Six (6) weeks before telecommunication services will be required.
Checklist for Building NOC:
  • Site affection plan along with Project Population Plan/calculation.
  • Detailed SCS Building Floor Drawing showing equipment room positions, room layouts,
    ACP/CP layouts and SCS containment systems.
  • SCS schematic drawing (riser diagram).
  • Electrical single line diagram related to telecommunications facilities (including GSM).
  • Detailed GSM Floor drawings (all floors including basement) showing GSM room positions,
    GSM risers, GSM room layouts including MEP details and GSM containments
    (horizontal and vertical) as per NOC guidelines (GSM/mobile).
  • GSM schematic drawing (riser diagram) showing GSM room floor location and horizontal/vertical containments.
  • GSM lead letter to be attached.